Construction project management glossary

Definitions of common construction project management terms and how SubmittalLink uses them.

A submittal review response meaning the item is accepted, as long as the reviewer’s comments are followed. Also called “Approved with Comments” or “Furnish as Corrected.” Work can proceed with the noted changes.

The person or people responsible for the next action on an item. In SubmittalLink, ball in court updates automatically as reviewers respond, and the Home dashboard lists everything in your court. See Review workflow and ball in court.

A written amendment to a construction contract that changes its scope, price, or time. See Change orders.

The prime contract between the general contractor and the project owner. SubmittalLink allows one per project. See Contracts.

A cover page on a submittal package that summarizes the submittal for reviewers. SubmittalLink can generate one automatically. See Coversheets.

The longest chain of dependent schedule activities. A delay to any of them delays project completion. See Schedule.

A daily record of site activity: crew, visitors, deliveries, meetings, weather, and notes. Also called a daily log. See Daily reports.

People copied on a submittal, RFI, or task to stay informed, without being responsible for a response.

A SubmittalLink role for superintendents and field staff. Field users can create RFIs, tasks, daily reports, and punch lists. See Roles and permissions.

The time between ordering a material and its delivery to site. Long-lead items, like switchgear, elevators, and curtain wall, must be submitted and approved early. See Material release tracking.

Authorization to order or fabricate an approved material. SubmittalLink records the Released On date and estimates delivery.

A list of incomplete or deficient work items to fix before project closeout. See Punch lists.

A contract to buy materials or equipment from a supplier. See Contracts.

The subcontractor or supplier who provided a submittal to the general contractor.

One stage in a submittal or sequential RFI review. Steps run in order, for example engineer, then architect, then owner.

A submittal review response meaning the submittal isn’t accepted as submitted. The contractor must correct it and send a new revision. Often abbreviated R&R.

A resubmission of a submittal after review, numbered 0, 1, 2, and so on. See Submittal revisions.

A formal question from the contractor to the design team or owner asking to clarify the drawings, specifications, or contract. See RFIs and RFI meaning in construction.

The person responsible for an RFI in SubmittalLink. They get reminders, receive ball in court after review, and can delete the RFI.

Detailed drawings prepared by a subcontractor, fabricator, or supplier that show how components will be made and installed. They’re submitted for review as submittals.

A numbered section of the project specifications, usually following CSI MasterFormat, for example 09 29 00 Gypsum Board. See Spec sections.

A contract between the general contractor and a trade subcontractor. See Contracts.

A package of product data, shop drawings, samples, or other information that a contractor sends to the design team for approval before buying or installing materials. See Submittals and What is a construction submittal?.

A list of every submittal on a project, with its number, spec section, status, dates, and ball in court. Also called a submittal register. In SubmittalLink, the Submittals list is your submittal log.

The person responsible for a submittal in SubmittalLink. Ball in court returns to them after all review steps are complete.

A change order that adds days to the contract duration, sometimes at no cost. See Time extensions.

A cover document that lists what’s being sent, to whom, and why. A submittal coversheet often serves this purpose.